Holmes County commissioners have hired an engineering firm to design a replacement building for the County Engineer’s Office and garage. Commissioners say the current facility is experiencing significant deterioration, including roof problems and damaged concrete, forcing equipment to be stored outside. The proposed building, which will be constructed on the same site as the county’s existing facility, will be roughly the size of a football field. The cost of the new building has yet to be determined.